Call Us +63 960 904 6251 nasecore@gmail.com
NASECORE NASECORE NASECORE
  • Profile
    • Mission Statement
    • Accomplishments
  • Actions
    • Letters
    • Interventions
    • Petitions
    • Press Releases
  • News
  • Consumer Education
    • Understanding Your Electricity Bill
    • Consumer Tips
    • FAQs
  • Blogs
  • Contact
  • Home
  • /
  • News
  • /
  • [Energy Storage] Solar-plus-storage project with up to 4,500MWh of batteries proposed in Philippines

[Energy Storage] Solar-plus-storage project with up to 4,500MWh of batteries proposed in Philippines

July 20, 2022 Admin No Comments Blogs, News Prime Infra, Razon, Solar, Terra Solar

An infrastructure group owned by billionaire Enrique K Razon has proposed construction of a solar-plus-storage project in the Philippines, which would be one of the biggest in the world.

Prime Infrastructure Holdings (Prime Infra) is owned by Razon, chairman and CEO of marine cargo-handling services group International Container Terminal Services Group.

The company said last week that it is developing a project which would combine anything between 2,500MW and 3,500MW of solar PV generation with battery storage of 4,000MWh to 4,500MWh capacity.

Calling it “a model of dependable renewable energy,” the project would be built through companies controlled by Prime Infra, together with Solar Philippines.

Prime Infra and Solar Philippines – founded and led by young entrepreneur Leandro Leviste – have formed a joint venture (JV) called Terra Solar to work on developing solar-plus-storage plants in the Southeast Asian country.

In January, Terra Solar proposed to supply 850MW of mid-merit power, which broadly speaking is energy supplied to meet the gap between baseload and peaking power capacity, to Manilla Electric Company (Meralco).

This power would be supplied from the new plant. A location for the solar-plus-storage capacity was not disclosed, and Terra Solar is thought to be considering development of facilities at several sites in the Central Luzon region to meet its 20-year PPA obligation to Meralco.

Terra Solar noted that it beat two competitors’ proposals in the tender for the off-take contract, which was approved by the government Department of Energy. Meralco had been mandated by the department to increase its share of renewable generation via its Renewable Portfolio Standard (RPS).

Under the terms of the PPA, the first 600MW of clean power supply needs to be going to the utility by 2026 and the remaining 250MW by 2027. Not only will the energy supplied by emissions-free, but it will also be de-coupled from vulnerabilities to fossil fuel price vulnerability.

“We, at Prime Infra Group, are delighted to move forward with Meralco on this record-breaking project that highlights solar power’s important contribution to strengthening the country’s energy security — solar, which is normally looked at for peaking, is now being made available by Terra Solar to answer Meralco’s mid-merit requirement, thereby addressing both the need for additional capacity and compliance with RPS,” Prime Infra CEO Guillaume Lucci said.

“DOE and Meralco should be commended for approving a project that is not only transformational and profound to the renewable energy landscape, but also for managing to do so at a competitive price.”

The Philippines has rapidly become one of the most talked-about energy storage markets in Asia, with major power generation companies SMC Global Power and Aboitiz Power among those investing in portfolios of battery storage. The country’s first-ever co-located solar and storage plant went online earlier this year.

Meanwhile, the Southeast Asian subcontinent’s largest single-site battery storage project to date is a 45MW/136.24MWh facility at a 49MW solar farm currently under construction in Thailand.

Source:

https://www.energy-storage.news/solar-plus-storage-project-with-up-to-4500mwh-of-batteries-proposed-in-philippines/

Share:
prev post next post

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • Electricity is a right: NASECORE urges Pres. Marcos to back P600-B subsidy
  • Rebuttal to DOE’s Statement on the “Impossibility” of Electricity Subsidies
  • AWAT na, SOBRA na, ITAMA na
  • Consumers robbed twice: ERC lets MERALCO keep billions in over-recovered funds
  • NASECORE calls on ERC to recall MERALCO refund, demands audit of P19.9B over recoveries

Recent Comments

  • [Tip] A customer may demand the full refund of his/her deposit from the distributor (ex. Meralco) within 3 years. – NASECORE on ERC Guidelines to Implement 7, 8, 14 and 28 of the Magna Carta for Residential Electricity Consumers.

Categories

  • Accomplishments (7)
  • Blogs (23)
  • Consumer Education (8)
  • Consumer Tips (3)
  • Interventions (6)
  • Letters (17)
  • Meralco 5RP (3)
  • News (37)
  • Petitions (1)
  • Press Releases (7)
  • Replies (2)
  • Transportation (1)

Recent Posts

  • Electricity is a right: NASECORE urges

    May 27, 2025
  • Rebuttal to DOE’s Statement on the

    May 26, 2025
  • AWAT na, SOBRA na, ITAMA na

    April 8, 2025

Archives

  • May 2025
  • April 2025
  • March 2025
  • February 2023
  • January 2023
  • December 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • March 2022
  • February 2022
  • December 2021
  • September 2021
  • August 2021
  • May 2020
  • December 2019
  • May 2018
  • December 2015
  • December 2013
  • November 2012
  • July 2009
  • December 2004
  • January 1998
  • February 202

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

CONTACT US

Phone: +99 858 547 589
Email : politic@email.com
Address: House 10, Road Nomber 32 Mohammadpur, Dhaka 1212.

Footer logo

There are many variations of passaes of Ipsum avalable, but the majority have sueratio inome fornjected humour, or romised s which

INSTAGRAM PHOTOS

Please enter your access token.

Instagram Feed Not found Please enter valid Access Token.(Enter Access Token)

Copyright © Politic. All Rights Reserved.