Call Us +63 960 904 6251 nasecore@gmail.com
NASECORE NASECORE NASECORE
  • Profile
    • Mission Statement
    • Accomplishments
  • Actions
    • Letters
    • Interventions
    • Petitions
    • Press Releases
  • News
  • Consumer Education
    • Understanding Your Electricity Bill
    • Consumer Tips
    • FAQs
  • Blogs
  • Contact
  • Home
  • /
  • Letters
  • /
  • NASECORE Seeks Clarity on Section 26 of EPIRA

NASECORE Seeks Clarity on Section 26 of EPIRA

February 2, 2026 Nasecore dev No Comments Letters

On 22 January 2026, the National Association of Electricity Consumers for Reforms, Inc. (NASECORE) formally wrote the Energy Regulatory Commission (ERC) to seek clarification on the implementation of Section 26 of the Electric Power Industry Reform Act (EPIRA)—a provision intended to ensure that electricity consumers benefit when distribution utilities earn income from related businesses.

This communication is not a complaint and not an accusation. It is a formal inquiry anchored on transparency, faithful implementation of the law, and the protection of captive electricity consumers.

What Section 26 of EPIRA Requires

Section 26 allows distribution utilities, such as Manila Electric Company (MERALCO), to engage in distribution-related or asset-maximizing businesses only if strict conditions are met. Most important among these is the requirement that a portion of the net income derived from such undertakings must be used to reduce distribution wheeling charges, subject to ERC determination and safeguards against cross-subsidy.

Compliance with Section 26 is not optional. It is conditional and cumulative, requiring satisfaction of all four statutory conditions, including:

  • confirmation that the business maximizes distribution assets;
  • verification that net income is actually applied to reduce wheeling charges;
  • observance of the 50% income limitation; and
  • maintenance of separate accounts with no cross-subsidy or encumbrance of regulated assets.

Why NASECORE Raised the Inquiry

Based on MERALCO’s 2022–2024 Annual and Integrated Reports and Audited Financial Statements, the utility has disclosed significant and growing investments in subsidiaries, associates, and joint ventures—covering power generation, retail electricity supply, engineering, ICT, financial services, real estate, insurance payments, and other non-core or “beyond-energy” activities.

Given this expansion, NASECORE asked a simple but crucial consumer question:

Have these investments resulted in actual reductions in distribution charges, as Section 26 of EPIRA requires?

What NASECORE Asked the ERC to Clarify

In its letter, NASECORE respectfully requested the ERC to identify and confirm, for each relevant subsidiary, associate, or joint venture:

  • whether it has been determined to fall under Section 26;
  • whether income from such entities has been applied to reduce MERALCO’s distribution wheeling charges;
  • whether ERC approvals or determinations support such treatment; and
  • whether proper accounting separation and anti-cross-subsidy safeguards are in place.

NASECORE also sought transparency on investment growth from 2017 to 2024, including whether increased investments involved regulated assets or consumer-funded revenues, and how any resulting income was treated for rate-setting purposes.

Why This Matters to Consumers

Section 26 exists to ensure that when a utility earns from businesses that rely on distribution assets paid for by consumers, consumers share in the benefit—through lower charges. Without clear disclosure, verification, and regulatory determination, this statutory protection risks being reduced to a formality rather than a real safeguard.

This inquiry is part of NASECORE’s continuing effort to promote:

  • transparency in rate-setting,
  • clear segregation of regulated and non-regulated activities, and
  • faithful enforcement of EPIRA in the interest of millions of electricity consumers.

NASECORE respectfully requested a written response from the ERC to place these matters on record and help clarify how Section 26 is being implemented in practice.

SECTION 26 OF EPIRA LETTER
Share:
prev post next post

Leave a Comment Cancel reply

Your email address will not be published. Required fields are marked *

Recent Posts

  • NASECORE FILES CONSOLIDATED MOTION
  • ERC Responds to Opposition on Resolution No. 23 (s.2025)
  • ERC Issues Order on MERALCO Application
  • ERC Case No. 2026-016 RC
  • NASECORE Urges ERC to Standardize Monthly Electricity Billing

Recent Comments

  • [Tip] A customer may demand the full refund of his/her deposit from the distributor (ex. Meralco) within 3 years. – NASECORE on ERC Guidelines to Implement 7, 8, 14 and 28 of the Magna Carta for Residential Electricity Consumers.

Categories

  • Accomplishments (7)
  • Blogs (23)
  • Consumer Education (8)
  • Consumer Tips (3)
  • Interventions (7)
  • Letters (24)
  • Meralco 5RP (3)
  • News (43)
  • Petitions (2)
  • Press Releases (7)
  • Replies (2)
  • Transportation (1)

Recent Posts

  • Thumb

    NASECORE FILES CONSOLIDATED MOTION

    March 6, 2026
  • ERC Responds to Opposition on Resolution

    February 27, 2026
  • ERC Issues Order on MERALCO Application

    February 27, 2026

Archives

  • March 2026
  • February 2026
  • January 2026
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2023
  • January 2023
  • December 2022
  • October 2022
  • September 2022
  • August 2022
  • July 2022
  • March 2022
  • February 2022
  • December 2021
  • September 2021
  • August 2021
  • May 2020
  • December 2019
  • May 2018
  • December 2015
  • December 2013
  • November 2012
  • July 2009
  • December 2004
  • January 1998
  • February 202

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org

CONTACT US

Phone: +99 858 547 589
Email : politic@email.com
Address: House 10, Road Nomber 32 Mohammadpur, Dhaka 1212.

Footer logo

There are many variations of passaes of Ipsum avalable, but the majority have sueratio inome fornjected humour, or romised s which

INSTAGRAM PHOTOS

Please enter your access token.

Instagram Feed Not found Please enter valid Access Token.(Enter Access Token)

Copyright © Politic. All Rights Reserved.